Project data

Prev Next

Project export

It is possible to export a project’s structure in XML format to import it into another Tuleap instance. This saves time when creating a new project, as you won’t need to set up everything again, except for the artifacts, which are not included in this export.

Project administration interface showing XML export instructions and export button.

Project History

Here, you can view the history of all actions performed by project members. You can sort the records by event type (permissions, project, users, etc.), by value, by date, or by member.

If needed, Tuleap also allows you to export this data in CSV format.

Project administration interface showing change history and permission events for documents.

Access Logs

You can choose which access information to review by selecting whether to see it for all users, non-members, or project members.

You can also select the time period for this information (4, 7, 12, 30, or 52 days) and, if needed, export the log in CSV format.

Access logs section showing options for user data and file downloads over 14 days.